首页 > Nortel > Other Nortel Certification > 922-111

Communication Server 1000 to Rls.6.0 Upgrades for Technicia:922-111

科目编号:922-111

科目名称:Communication Server 1000 to Rls.6.0 Upgrades for Technicia

描述:
922-111 考试是 Nortel 公司的 Communication Server 1000 to Rls.6.0 Upgrades for Technicia 认证考试官方代号,kaoccna 的 922-111 权威考试题库软件是 Nortel 认证厂商的授权产品,kaoccna 绝对保证顺利通过,否则承诺全额退款!
Communication Server 1000 to Rls.6.0 Upgrades for Technicia 认证作为全球IT领域专家 Nortel 热门认证之一,是许多大中 IT 企业选择人才标准的必备条件。 如果你正在准备 922-111 考试,为 Nortel Communication Server 1000 to Rls.6.0 Upgrades for Technicia认证做最后冲刺,又苦于没有绝对权威的考试真题模拟

    mcsepass 实行"一次不过全额退款"承诺。如果您购买我们 922-111 的考题,只要不是首次通过,凭盖有 PROMETRIC 或 VUE 考试中心钢印的考试成绩单,我们将退还您购买 922-111 考题大师的全部费用,绝对保证您的利益不受到任何的损失。

922-111
  • 科目: 922-111
  • 原价: ¥ 585.00
  • 现价: ¥ 358.00

kaoccna 的优势

922-111 试题的质量和价值
mcsepass 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
100% 保证您通过 922-111 的考试
如果你使用 mcsepass 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!
试用后再购买
mcsepass 提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性。
kaoccna认证考试题库网专业提供 Nortel 922-111 最新题库下载,完全覆盖 mcsepass 考试原题。

部分考题展示

 
 
Exam : Nortel 922-111
Title : Communication Server 1000 to Rls.6.0 Upgrades for Technicia


1. A customer with an existing Option 11C Rls. 5.5 chassis system is planning to upgrade to a Communication Server 1000E Rls. 6.0 Standard Availability. A CPPM Co-Resident Call Server and Signaling Server card will be installed. The system will automatically map small system Terminal Numbers to large system Terminal format during the upgrade. In this upgrade scenario, which actions must be completed manually? (Choose two.)
A. Re-programming Digital Trunk Terminal Numbers with a new format.
B. Programming the DSP daughterboards on the IP Media Gateway.
C. Entering the IP address for each IP Media Gateway in LD 97.
D. Re-programming Tone Receiver Terminal Numbers with a new format.
Answer: BC

2. A customer with a Communication Server (CS) 1000E Rls. 5.5 with two IPMGs is upgrading their system to release 6.0. The upgraded system will have two IP Media Gateways. Which statement is true regarding DSP resources for the IP Media Gateways in the upgraded system?
A. DSP resources are no longer required for inter-IPMG calls.
B. DSP resources are localized to a particular IPMG where the DSP resource is located.
C. DSP resources are considered system resources and are not localized to a particular chassis.
D. DSP High density and low density DSP resources can not be mixed.
Answer: B

3. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and dual CPPM Signaling Servers is upgrading their system to release 6.0. The system is part of an IP Peer Network that includes a NRS database. Which upgrade step is correct?
A. Use NRS Manager to download the NRS backup file to a compact flash.
B. Use Element Manager to download the Signaling Server backup file to a compact.
C. Use NRS Manager to download the NRS backup file to the local PC.
D. Use Element Manager to download the Signaling Server backup file to the local PC.
Answer: C

4. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and dual CPPM Signaling Servers is upgrading their system to release 6.0. The update to the CPPM Signaling Server BIOS is completed and the hardware has been configured as a Signaling Server. While loading the Linux base you are asked to enter a Fully Qualified Domain Name (FQDN). From which two parts is the FQDN composed and in which order must they be configured?
A. first the host name and then the domain name
B. first the domain name and then the host name
C. first the server IP address and then the port number
D. first the server port number and then the IP address
Answer: A

5. A customer with a Communication Server (CS) 1000E at Rls. 5.5 with two IPMGs is upgrading the system to release 6.0. This upgrade includes a Media Gateway Controller card with one high density and one low density DSP daughterboard. How many one way voice channels does this configuration provide?
A. 32
B. 64
C. 96
D. 128
Answer: D

6. A customer with a Communication Server (CS) 1000E Rls. 5 HA CPPIV system with two IPMGs and dual ISP 1100 Signaling Servers is upgrading their system to release 6.0. The upgrade plan is to:
1)replace the ISP 1100 systems with CPPM Signaling Servers
2)load the Linux Base onto both CPPM Signaling Servers
3)designate the CPPM SS1 as the Primary Security Server
4)designate the CPPM SS2 as the Backup Security Server.
With respect to this upgrade plan, which statement is true?
A. CPPM SS2 can deploy applications to itself only.
B. CPPM SS1 can deploy applications to itself only.
C. CPPM SS1 can deploy applications to itself and to CP PM SS2.
D. CPPM SS2 can deploy applications to itself and to CP PM SS1.
Answer: C

7. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and redundant CPPM Standalone Signaling Servers is upgrading the system to release 6.0. What must be done to the Signaling Server card before the upgrade can be completed?
A. Add a security device to the card.
B. Add a 40 GB FMD (hard drive) to the card.
C. Upgrade the VxWorks software to Pls. 6.0.
D. Add 1 GB DDR SO-DIMM memory to the card.
Answer: D

8. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and dual ISP 1100 Signaling Servers is upgrading the system to release 6.0. CPPM Call Server cards from inventory are being re-configured as CPPM Signaling Server cards to replace the ISP 1100s during the upgrade. Which tasks must be completed to re-configure the CPPM card hardware into a Signaling Server?
A. Remove the on-board 1 GB Flash FMD.
B. Set the S5 switch to OFF Position.
C. Set the S5 switch to ON Position.
D. Remove the 40 GB Hard Drive FMD.
Answer: A

9. Click on the Exhibit button.
A customer with an existing Communication Server (CS) 1000E Rls 5.5 HA system wants to upgrade to a CS 1000E Rls. 6.0 HA system.
Which hardware components from the system shown in the exhibit must be replaced during the upgrade to release 6.0? (Choose two.)
A. CPPIV Call Processors
B. Small System Controller Card
C. ISP 1100 Signaling Server
D. Media Card 32
Answer: BC

10. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMG systems and dual ISP 1100 Signaling Servers is upgrading their system to release 0. The ISP 1100 Signaling Servers are being replaced with CPPM Signaling Server cards from inventory. The contents of the upgrade kit have been installed and the card is configured as a Signaling Server. A maintenance terminal connection has been established, what are three other upgrade tasks to be completed? (Choose three.)
A. power down the system to insert the CPPM card
B. insert the bootable CF into the Faceplate
C. connect the card to the TLAN/ELAN subnets
D. place the CPPM card into an empty card slot
E. change the speed of the COM port to 19,200
Answer: BCD

联系我们
联系手机:13861768475
MSN:saleintest@hotmail.com
QQ留言 QQ留言

首页 |代考流程 | 常见问题 | 证书查询 | 认证资讯 | 联系我们 | 站点导航 1 2 3 4 | 站点地图

Any charges made through this site will appear as CertBible Tech LTD. All trademarks are the property of their respective owners.

Copyright©2006-2011 mcsepass Limited. All Rights Reserved